What Was Done
• Framing & Structure
The existing deck was fully removed and replaced with a reinforced frame built from pressure-treated lumber. Each joist and beam was aligned for optimal load capacity and long-term stability.
• Decking Installation
Premium composite decking was installed using hidden fasteners for a seamless, screw-free surface. Precision mitered corners and custom fascia wrapping define the craftsmanship and attention to geometric alignment.
• Stairs & Detailing
Low-profile steps were integrated into the design with the same decking material, achieving a cohesive, modern aesthetic. The layout supports smooth transitions from interior to exterior, making the space both practical and visually continuous.
• Finish & Protection
Every component was installed for maximum longevity and minimal maintenance — weather-resistant, fade-proof, and ready for year-round Northwest conditions.
Our Process
Step 1
Step 2
Step 3
Step 4
Step 5









WHAT ABOUT YOUR PROJECT?Frequently Asked Questions
Usually 4–8 weeks depending on the size and scope.
No, we handle sourcing, delivery, and coordination.
Yes, most clients do. We minimize noise and dust.
Costs vary, but we provide a detailed estimate upfront.
Yes, we guide you through design and selections.
No, our team manages everything and keeps you updated.
EMAIL US WITH EASESubmit form

